CBM Vertical Factory (2023 ongoing)
Project Data
Total GFA: 40.000m2
Location: Shenzhen, China
Function: Vertical Factory (Production, Office, R&D)
Features: First "DGNB Flex" Approach in China
Scope: Sustainability Consulting for DGNB Certification
Status: Planning / in construction
Project Summary
CBM is an innovation driver being the first Chinese supplier of life-saving ECMO equipment and a fast-growing provider of medical supplies.
Following the same dedication that goes into their products, CBM wanted to create an integrative, healthy and highly innovative headquarter as a "Vertical Factory".
The project uses the "DGNB Flex" as an easy way to combine different functions and respective requirements such as production, clean rooms, R&D, office as well as showrooms and social areas. Key points of the sustainability startegy are:
- a high flexibility and interchangeability between production and office floors
- a very attractive, highly functional and immersive work environment
- a strong sense of shared vision by creating visual connections between different departments
- an optimized HVAC system to dramatically reduce operation costs (now and in future use scenarios)
- an optimized CO2 Footprint due to low carbon building operation
- a work environment which actively promotes health, social and physical well-being
- a very convenient location with easy access to transport and daily-use amenities