VW Electromobility Plant (2019)
Project Data
Total GFA: 560.000m2
Location: Shanghai, China
Function: Industrial
Standard: DGNB Silver / Gold / Platinum (planning)
Features: Study for combined DGNB Building and District Certification
Scope: DGNB Pre-Assessment and Variant Comparison
Status: Planning
Project Summary
VW’s new state-of-the-art MEB Plant for production of electric mobility in Shanghai is currently on the threshold from planning to construction stage for the majority of buildings.
In order to assess the measures needed to achieve DGNB Certification for this project, a complex Pre-Check was conducted. This included a total of 7 individual buildings / building groups as well as the evaluation of the entire site, according to the relevant DGNB certification schemes for Production, Warehouse, Office, Parking and Industrial Site. The final report includes:
- Introduction of DGNB System
- Comprehensive indicator-by-indicator assessment of current construction drawings for each building / scheme
- Comprehensive overview of current DGNB scoring for each building / scheme
- Optimization table with comprehensive list of suggested improvements for each building / scheme according to different certification targets: Silver / Gold / Platinum
- Indication of scheduling and cost impact as well as user benefits beyond DGNB scoring for each optimization measure
- Proposed strategy for certification as executive summary